CONCEPT REFURBISH — prepared by oxvelo for review · not the live gedeongrc.com site
GEDEON GRC25 YRS
Start a project

Portfolio

CR 19 over I-495 (LIE): Bridge Replacement Design

Preliminary design (Phases I–IV) for the replacement of the CR 19 bridge over the Long Island Expressway in Brookhaven.

← ALL PROJECTS

Project facts

Client / ownerNYS Department of Transportation
LocationSuffolk County, NY
RolePreliminary design consultant (Phases I–IV)
Budget (as published)$11.6M
DisciplinesBridge Engineering · Traffic / Transportation Engineering

Overview

Gedeon GRC Consulting provided preliminary design services — Phases I–IV — for the bridge replacement of CR 19 over I-495, located in the Town of Brookhaven, Suffolk County, NY. The replacement gives the region the ability to construct critical bridge improvements that eliminate bridge deficiencies and improve the area’s infrastructure. The existing bridge is a four-span, multi-steel 12-girder structure with a condition rating of 4.063 (on a scale of 1 to 7) per the 2008 Biennial Inspection Report — at the time, the lowest in the region.

Scope of services

The project scope involved a traffic analysis of existing conditions and recommended methods for determining repair needs for the replacement of the bridge deck and superstructure. Bridge work included structural assessment, fatigue analysis, design for steel and concrete repair, continuity retrofit, bearings, retaining wall design, railings, lighting upgrade, asbestos removal, MPT design and related tasks. The project also involved coordination with various agencies and public outreach.

Start a conversation

Planning a project like this one?

Talk with our engineers about scope, delivery method and schedule — from first study to final inspection.