Portfolio
New York State Route 110: Reconstruction Planning & Design Services
Total planning and design for the reconstruction of a heavily traveled one-mile segment of Route 110 in the Town of Huntington.
Project facts
| Client / owner | NYS Department of Transportation |
|---|---|
| Location | Suffolk County, NY |
| Role | Sub-consultant to NYSDOT |
| Budget (as published) | $18M |
| Disciplines | Bridge Engineering · Traffic / Transportation Engineering |
Overview
Gedeon GRC Consulting was retained, as a sub-consultant, by NYSDOT to provide total planning and design services for the reconstruction of Route 110 — a one-mile segment in the Town of Huntington, NY. The project involved evaluating feasible alternatives for roadway and significant drainage improvements on NYS Route 110 from the Madison Street / Prime Avenue intersection to Young’s Hill Road, a distance of 1.45 km (0.9 miles).
Preliminary design
The scope entailed preliminary design services (Phases I–IV) associated with evaluating the feasible alternatives for roadway and drainage improvements. Preliminary design included preparation of a Design Report, development of design alternatives featuring two roundabouts, design and right-of-way survey and mapping, involvement in a public hearing and other public involvement activities, and evaluation of the social, economic and environmental impacts associated with the alternatives.
Final design
The final design stage involved Maintenance and Protection of Traffic (MPT), signage and striping, grading, utilities, lighting, pavement markings, traffic signals, ADA ramps, landscaping and typical sections, as well as specifications and estimates.
Start a conversation
Planning a project like this one?
Talk with our engineers about scope, delivery method and schedule — from first study to final inspection.