PANYNJ / JFK International Airport: Redevelopment

Site/civil, structural and traffic engineering across demolition, terminal renovation and New Terminal One assignments at JFK.

← ALL PROJECTS

Project facts

Client / ownerPort Authority of New York & New Jersey
LocationQueens, NY
RoleSub-consultant — civil, structural & traffic
Budget (as published)$19B
DisciplinesCivil / Site Engineering · Structural Design · Traffic / Transportation Engineering

Overview

Gedeon GRC Consulting was retained as a sub-consultant to provide site/civil, structural and traffic engineering services for the JFK Airport Redevelopment Project. Responsibilities included review of existing data, field-conditions assessment, structural facilities inspection, development of structural computations, demolition design, temporary canopy design, pedestrian and vehicular wayfinding design, pavement assessment and design, drainage design, utilities relocation, erosion and sedimentation control, SWPPP review, sidewalk and curb design, pedestrian ramps, MOT, report preparation, preliminary and final design, reviews (including TAA/PA), and coordination with the CM and Terminal 1 designers.

Assignments delivered

  • Green Garage Demolition — demolition of a four-story parking garage (steel frame / precast concrete double-tee deck) and demolition/relocation of site elements within project areas, including utilities
  • Terminal 2 AirTrain Station demolition/decommissioning — demolition of the station enclosure, protection of elevated rail/guideways, demolition of the three-story station enclosure and relocation/salvage of associated equipment
  • Terminal 2 Demolition — phased demolition of the building including foundation, structural framing, roof system, exterior retaining walls and the associated structural system
  • Terminal 8 Concessions Renovation — full professional structural engineering services for the renovation of retail, dining and common areas, including the Great Hall, Welcome and Orientation Zone, The Show, Arrivals and interstitial spaces
  • New Terminal One — civil/traffic engineering and structural support, including pedestrian and vehicular wayfinding sign design for construction-phase and post-construction conditions, and Work Zone Traffic Control (WZTC) design for utility installation, temporary and final roadways, new signage, demolition of existing buildings and parking structures, and construction of new buildings

For each assignment, Gedeon GRC developed contract documents including plans, specifications and estimates.

Start a conversation

Planning a project like this one?

Talk with our engineers about scope, delivery method and schedule — from first study to final inspection.