CONCEPT REFURBISH — prepared by oxvelo for review · not the live gedeongrc.com site
GEDEON GRC25 YRS
Start a project

Portfolio

Design & CSS for Reconstruction & Rehabilitation of RFK Bridge in NYC

Civil design for the Manhattan approach ramps of the Robert F. Kennedy Bridge — a 1936 landmark linking three boroughs.

← ALL PROJECTS

Project facts

Client / ownerMTA – Triborough Bridge Tunnel Authority
LocationManhattan, NY
RoleCivil engineering design consultant
Budget (as published)$75M
DisciplinesBridge Engineering

Overview

Gedeon GRC Consulting provided civil engineering design services for the Manhattan approach ramps — East 124th and East 125th streets and the FDR — at the Robert F. Kennedy (RFK) Bridge. Built in 1936, the RFK Bridge consists of three bridge structures and two toll plazas, together with elevated viaducts and a junction structure that distribute traffic between three borough crossings: the East River Suspension Span, the Harlem River Lift Span and the Bronx Kill Truss.

Scope of services

Bridge work involved the replacement and/or rehabilitation of decks, joints, barriers, drainage, lighting, superstructure and substructure, as determined by inspection, investigation and review of the latest Biennial Inspection reports. The scope included bridge inspection, drainage, stormwater management, erosion and sediment control, a Stormwater Pollution Prevention Plan (SWPPP), water permits, and preparation of reports, plans, specifications and estimates (PS&E) — with coordination among agencies including NYSDOT, NYCDOT, NYSDEC, NYCDEP, DSNY, NYCDPR and MTA Bus.

Start a conversation

Planning a project like this one?

Talk with our engineers about scope, delivery method and schedule — from first study to final inspection.